Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the cyrlitera domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/investmentindubai.ae/investmentindubai.ae/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wpcf7-redirect domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/investmentindubai.ae/investmentindubai.ae/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/investmentindubai.ae/investmentindubai.ae/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/investmentindubai.ae/investmentindubai.ae/wp-includes/functions.php on line 6114
Property for Investment in Mercer House, Dubai - InvestmentInDubai.ae

Mercer House

About Mercer House

Status

Under construction

Deadline

3Q 2027

Developer

Ellington Properties

District

Uptown Dubai

Squares

from 516 sq ft

Price

from 545 200 $

Mercer House is a residential complex by the developer Ellington Properties, renowned for numerous successful projects in Dubai. It is set to be constructed in the heart of the Uptown district, in the southern part of the city. The creators have planned the construction of two high-rise buildings, connecting them with an artificial podium featuring a recreation area, a large pool, and an artificial beach area.

Various types of real estate are available for purchase, including apartments or studios ranging in size from one to three bedrooms, as well as penthouses with four bedrooms. The cost of the properties will vary significantly, depending on the space: apartments ranging from 48 to 878 square meters will be available for purchase. All units will feature a small laundry room and one or more balconies. Spacious apartments will be complemented by an office and a room for service personnel.

Penthouses will include a small pool with a terrace, a relaxation area, and two kitchens – a demonstration version and a standard execution. Designers have ensured the inclusion of high-quality appliances and reliable work surfaces – for example, the hood will be retractable, complemented by a modern charcoal filter and touch controls.

Payment plan

first installment

20 %

under construction

50 %

on key handover

30 %

Advantages

On the artificial podium between the high-rise buildings, there will be a recreational area featuring a massive pool with varying depths, surrounded by a beach with a total area exceeding 4,000 square meters. Adjacent to the pool, there will be a bar and a three-story club housing various dining establishments. The area will also include several retail outlets, tennis courts, squash courts, padel tennis courts, and a gym equipped with modern interactive exercise machines. The children’s play areas are meticulously designed, with the outdoor activity zone resembling a submarine, and this theme is reflected in every detail.

  • Pool

  • Sports Hall

  • Children playground

  • Barbecue area

  • 24/7 security

  • Covered parking

  • Cafes and restaurants

Layout

Gallery

Location

The Uptown district is one of the most promising areas, attracting not only entrepreneurs but also government investments. As a result, the public transportation system is actively developing. Mercer House complex is conveniently located near three bus stops and a metro station. Within a short walking distance, residents can find small markets, a nursery, a medical center, a veterinary clinic, and even escape rooms. Mercer House is just a 30-minute drive away from Dubai International Airport.

Other projects

Expo Valley

Deadline Q4 2025

Payment plan 10% / 40% / 50%

Price from $954 000

Ellington Villa Collection – La Mer

Jumeirah 

Deadline Q4 2024

Payment plan on request

Price from $89,8 000 000

Plagette 32

Tilal Al GhafTilal Al Ghaf by Majid Al Futtaim

Deadline 4Q 2026

Payment plan 10 % / 50 % / 40 %

Price from 2 044 300 $

SLS The Palm

Palm Jumeirah 

Deadline 2026

Payment plan 10% / 50% / 40%

Price from $1,900,000

Serenity Mansions

Tilal Al Ghaf

Deadline 2Q 2026

Payment plan 10 % / 50 % / 40 %

Price from 10 629 900$

Upside

Business Bay

Deadline Handed over

Payment plan 15% / 10% / 75%

Price from $262 000

Get expert advice

Leave your details

    Name

    Email