About South Bay 5
Status
Under construction
Deadline
3Q 2026
Developer
Dubai South
District
Dubai South
Squares
from 3562 sq ft
Price
cyrlitera
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/investmentindubai.ae/investmentindubai.ae/wp-includes/functions.php on line 6114wpcf7-redirect
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/investmentindubai.ae/investmentindubai.ae/wp-includes/functions.php on line 6114wordpress-seo
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/investmentindubai.ae/investmentindubai.ae/wp-includes/functions.php on line 6114polylang
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/investmentindubai.ae/investmentindubai.ae/wp-includes/functions.php on line 6114Status
Deadline
Developer
District
Squares
Price
The South Bay 5 complex is situated along the central lagoon in the Dubai South area. The coastline of the artificial water body with its perfect promenade and luxurious beaches has become the main attraction of the community. South Bay 5 features townhouses with varying areas, ranging from 331 to 1263 sq. m. Depending on the size, the number of rooms also varies, with each building having three to seven bedrooms. In each residence, the kitchen is equipped with high-quality appliances that complement the apartment’s design.
The elite villas right by the coast have 6-7 bedrooms, a home theater, a gym, and a demonstration kitchen area that complements the standard enclosed kitchen. Luxurious residences will have a plot with a private garden, pool, and a spacious green lawn.
Layouts:
Townhouses
Villas
first installment
60 %
under construction
20 %
on key handover
20 %
Residents of South Bay 5 and their guests can enjoy all the public amenities created within the community: beaches near the lagoon, a park area, pools, a fitness center, as well as jogging tracks and a cycling alley. The area features private secured parking, a small shopping center, and a spa salon. A school and a children’s club operate in the vicinity, making the residential complex convenient for families with young children. In line with the country’s traditions, a new mosque has been built, serving as a necessity for citizens of the Islamic state.
Pool
Sports Hall
Children playground
Barbecue area
24/7 security
Covered parking
Cafes and restaurants
The Expo Road, located near the complex, ensures quick car travel to any area of Dubai. Public transport stops within the community are also available when needed. Along the complex, there are four stops, minimizing the time required for walks from the apartments. The infrastructure is well-developed within a 15-minute drive, including several supermarkets, various schools, medical centers, restaurants and cafes, fitness centers, as well as churches of different denominations.
Traveling to entertainment parks will take a little time: the thematic Motiongate Dubai, which replicates motifs from famous American film studios, Legoland Park created based on the popular game, and the stylized Riverland, as well as the Indian-themed Bollywood Parks, are all within easy reach.
Jumeirah Bay Island (Bulgari)
Deadline in progress
Payment plan on request
Price on request
Creek IslandDubai Creek Harbour
Deadline 2Q 2024
Payment plan 10% / 60% / 30%
Price from $354 000
Expo City Dubai
Deadline 1Q 2026
Payment plan 20 % / 50 % / 30 %
Price from 1 063 000 $
Leave your details
Leave your details
for life and investment
for life and investment