Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the cyrlitera domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/investmentindubai.ae/investmentindubai.ae/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wpcf7-redirect domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/investmentindubai.ae/investmentindubai.ae/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/investmentindubai.ae/investmentindubai.ae/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/investmentindubai.ae/investmentindubai.ae/wp-includes/functions.php on line 6114
Property for Investment in Upside, Dubai - InvestmentInDubai.ae

Upside

About Upside

Status

Handed over

Deadline

Handed over

Developer

Seven Tides

Squares

from 398 sq ft

Price

from $262 000

Upside

UPSIDE is an elite complex consisting of 31 floors, presented by the well-known holding company SRG Holding Ltd. Location – Business Bay.

Future buyers will be able to choose a suitable option from studio and single apartments being fully furnished. Full-fledged floors are also available to choose from. The area ranges from 37 to 61 square meters. The kitchens will be equipped with popular branded appliances from SMEG, while the bathrooms will feature sanitary ware and accessories from renowned companies Carlo Frattini & Geberit. Also, each residence will have LED lighting, BMS, ELV from the best brands in Europe and so on.

The spacious balcony of the residences offers spectacular views of the Burj Khalifa. Also, each dwelling has its own parking space.

Payment plan

first installment

15%

under construction

10%

on key handover

75%

Advantages

Future owners are offered many world-class opportunities and amenities. These are:

  • Open spaces.
  • Conference room.
  • Coworking area.
  • Gym for training.
  • Game room.
  • F&B establishments;
  • Landscaped garden.
  • Swimming pool.
  • A place to relax by the pool with a view of the Burj Khalifa.
  • Sports grounds.
  • A running track.
  • Prayer hall.
  • Pool

  • Sports Hall

  • Children playground

  • Barbecue area

  • 24/7 security

  • Covered parking

  • Cafes and restaurants

Layout

Gallery

Location

UPSIDE has the most advantageous position. It is located at the intersection of the popular Ras Al Khor Road and Financial Road, and this allows you to easily get to the most popular places in the city. For example, Dubai International Airport, DIFC and Za’abeel. DAMAC Paramount Towers is very close to DAMAC Properties. After spending 20 minutes on foot, you can walk to public transport stops, Business Bay 2 Bus Station 1 and Business Bay 2 Bus Station 4.

Using a car, you can reach various urban infrastructure facilities within a few minutes, such as:

  • Za’abeel Health Center;
  • Mashreq Bank Global HQ;
  • West Zone Fresh Supermarket;
  • Burj Khalifa;
  • The Dubai Mall;
  • Dubai Opera;
  • Souk Al Bahar.

Other projects

Damac Bay by Cavalli

Dubai Creek Harbour

Deadline 3Q 2027

Payment plan 20% / 60% / 20%

Price from $790 000

Naya

MBR City

Deadline 3Q 2027

Payment plan 20% / 60% / 20%

Price from $ 462 000

25H Heimat

Downtown Dubai 

Deadline 2Q 2027

Payment plan 20 % / 40 % / 40 %

Price from 954 000 $

Baccarat Residences

Downtown Dubai 

Deadline 2026

Payment plan 5% / 55% / 40%

Price from $4,9 000 000

Farm Gardens The Valley

Deadline Q3 2026

Payment plan 10% / 70% / 20%

Price from $1 380 000

Zuha Island

World Islands

Deadline Q2 2025

Payment plan 5% / 45% / 50%

Price from $16,335,300

Get expert advice

Leave your details

    Name

    Email